1800 211 212

The headache of multi-vendor projects

When designers, fabricators and installers work in silos, specs slip and budgets blow out.

One phone call, four deliverables

StageWhat TPA DeliversYour Benefit
1. DesignIn-house principal traffic engineer models cushion spacing, roundabout geometry and drainage.Optimised compliance and performance.
2. ManufactureRecycled-rubber modules are moulded to spec with embedded reflectors.Reliable lead-times and QA.
3. InstallationTrained crews install overnight with minimal closures.Reduced traffic disruption.
4. Warranty & Support5-year guarantee and rapid module replacement.Lower lifetime cost.

TPA’s “design-to-installation” promise lets councils issue a single purchase order, slash admin and hit safety targets fast.

Case-in-point: regional council roll-out

A Victorian municipality recently replaced 12 concrete splitter islands with rubber modules over two weekends, reopening each arterial road Monday morning—an impossible timeline with concrete.

CTA

Want the same seamless experience? [Contact TPA for a 100 % obligation-free estimate].