The headache of multi-vendor projects
When designers, fabricators and installers work in silos, specs slip and budgets blow out.
One phone call, four deliverables
Stage | What TPA Delivers | Your Benefit |
---|---|---|
1. Design | In-house principal traffic engineer models cushion spacing, roundabout geometry and drainage. | Optimised compliance and performance. |
2. Manufacture | Recycled-rubber modules are moulded to spec with embedded reflectors. | Reliable lead-times and QA. |
3. Installation | Trained crews install overnight with minimal closures. | Reduced traffic disruption. |
4. Warranty & Support | 5-year guarantee and rapid module replacement. | Lower lifetime cost. |
TPA’s “design-to-installation” promise lets councils issue a single purchase order, slash admin and hit safety targets fast.
Case-in-point: regional council roll-out
A Victorian municipality recently replaced 12 concrete splitter islands with rubber modules over two weekends, reopening each arterial road Monday morning—an impossible timeline with concrete.
CTA
Want the same seamless experience? [Contact TPA for a 100 % obligation-free estimate].